Burridge Electrical

📞 Call Us

📝 Get a Quote

The Solar Panel Installation Process in Bristol: What to Expect

By Burridge Electrical

Professional Solar Energy Installations with Insurance and Certification Included

NAPIT Registered Electrical Experts for Solar Work Recommended Solar Installers in the South West Insured and Vetted for Renewable Installations

Installing Solar Panels in Bristol? Here’s How It Works

If you're thinking about adding solar panels and battery storage to your home in Hanham, Kingswood, Staple Hill, or anywhere in Bristol, you’re probably wondering what the process involves. Let’s walk you through it step by step so you know exactly what to expect.

Step 1: Free On-Site Survey

We start with a free solar survey at your property. We’ll assess:

  • Roof direction, pitch and shading
  • Your home’s current electrical setup
  • Potential for battery storage

We’ll also answer any questions you have and explain how much you could save each year.

Step 2: Personalised Quote & System Design

Based on your energy usage and roof setup, we design a bespoke solar PV system. Your quote will include:

  • Panels, inverter, battery (if needed)
  • Full installation & scaffolding costs
  • Warranty info and estimated ROI

Step 3: Installation Day

Our friendly Bristol-based team arrives with everything needed. Most installs take 1–2 days, and we’ll handle:

  • Roof panel mounting
  • Inverter and cabling install
  • Fuse board connection and testing

We work cleanly and safely—and we always treat your home like our own.

Step 4: Commissioning & Paperwork

Once everything is installed, we:

  • Test and commission the system
  • Register it with your DNO (Distribution Network Operator)
  • Provide all handover docs, warranties, and aftercare info

You’re now generating clean energy right from your roof!

Step 5: Monitor and Save

You’ll be able to track your usage and savings in real time through a user-friendly app. Want to boost savings further? Consider upgrading your fuse board or adding smart meters for even better efficiency.

How Long Does It Take?

  • Survey to quote: 1–2 days
  • Install date: Within 2–3 weeks depending on demand
  • Install duration: Usually 1–2 days

We’re fast, efficient, and always keep you updated along the way.

Need Planning Permission?

In most Bristol homes, solar is classed as “permitted development” – no planning permission required. But if you're in a conservation area or have a listed building, we’ll guide you through the process.

Why Burridge Electrical?

We’ve helped homeowners across Downend, Warmley, Lyde Green, and Emersons Green go solar with confidence. Our experience means no delays, no nonsense – just honest advice and high-quality installs.

Ready to Go Solar?

Book your free home survey today and let’s get you generating clean energy right from your rooftop.

📞 Call Us: 0117 321 6406

✅ Book My Free Solar Survey


!! Take Care when Selecting an Electrician in Bristol

Many electricians in Bristol are simply not interested in the small jobs.They want the choice jobs and will drop you when a bigger,supposedly more lucrative project comes in.

Others advertise as electricians having no qualifications.They thrive on the basis that you don't understand what they do and as a result charging for shoddy,and often dangerous electrical work.

I set up Burridge Electrical to provide you with a quality service and provide you with exactly what you need from a qualified electrician.

Need solar power installed today? 📞 Call 0117 321 6406 or Book Online